Integration with PTC Integrity

One of the great challenges of software validation is knowing when to flag a test cycle as complete.  Achieving 100% code coverage and a 100% test case pass rate is not sufficient.  We can add an additional metric: Proof that 100% of the software requirements have been tested, along with a list of which test cases were utilized to test each requirement. 

The VectorCAST Requirements Gateway connects software requirements with test cases and code coverage, with real-time traceability between all three. 

Category : Whitepaper
Size : 687.22 KB
MD5 hash : 526c1f41f470fac94f55fb4bbbc293db

Please fill in the following form to get the download link via e-mail:

* Required

Previous